EPC works for the Upgradation of the Al Sila wastewater treatment plant from the existing capacity of 5,000m3/day to 10,000m3/day. Including construction of inlet lifting station, aeration tanks, clarifiers, filtration, chlorination, sludge thickener, drying beds, TSE storage reservoir capacity of 15,000 m3, the Final Effluent Pump Station (FEPS), Substation, Electrical & Control Building, Air Blower Building, including internal roads, and all ancillary works and Testing and Commissioning.
The Scope of works includes 2,800 m of sewerage from the main pumping station PS1 to the WWTP plant, and 4,200 sewer networks and 62 manholes to connect the Emarati housing network to the pumping station.