Project Details

Project Ref. No.: N-17315

Project Name: EPC Works of SWRO Pant with Feed Flow of 197,000 m3/d

Client: Abu Dhabi Transmission & Despatch Company

Location: Lulu Island, Abu Dhabi

Project Starting DateFebruary 9, 2020

Project EndJuly 15, 2021

Project StatusCompleted

MIRFA - SRO

Scope of Work

EPC works for the implementation of seawater RO Units capacity of 12.5 MIGD in Lulu Island, the scope includes all civil works, mechanical electrical and control for the seawater intake system, all pipeline works, UF backwash and RO reject disposal, SCADA system, permeate connection to feed TRANSCO network with potable water.

the scope includes all engineering and studies, such as preliminary design, detail design, HAZOP, brine water hydrodynamic, and simulation modeling studies, Design of the system includes all facilities such as In-take, reject, produced water, interface with Transco network, Power Supply arrangements/ Distribution, Operation & Control integration etc.