Latest News:

View all Pure Water Technology completed a turn key project for reverse osmosis plant with a capacity of 1000 m3 at Tanzania.     Pure Water Technology developed a new Control Panel for our plants to be touch screen with Scada System, remotely controlled and monitored.     Pure Water Technology has been awarded by Special Operation Command (SOC) for the design and construction of Reverse Osmosis at Dina Island-Abu Dhabi.     Pure Water Technology has been awarded by Wetco General Contracting a contract for the Engineering Construction of Sea Water Reverse Osmosis Plant with a capacity of 500 m3 at Labor Camp in Liwa.      Pure Water Technology has been awarded by General Head Quarters a contract for the complete refurbishment of 4,000 m3 of Seawater Reverse Osmosis Plant mounted on barge.      Pure Water Technology has been awarded by GHQ for the design and construction of 2200 m3/day Waste Water Treatment Plant including the main pumping station, force main, sewer network and manholes, irrigation tank and network including civil and electro-mechanical works.     Pure Water Technology designed and constructed Waste Water Treatment Plant capacity of 350m3/day at Labor Camp - Al Ruwais, Abu Dhabi.     Pure Water Technology has been awarded by General Head Quarters (GHQ) a contract for the Construction of Sewage Treatment Plant in Tawal Murrah Camp, Dubai. The Sewage Treatment plant has a capacity of 600 m3/day as two streams including all civil and electro-mechanical works with scada system. It also includes construction of GRP sewer network, 5 nos. lifting stations, tanker filling stations, pump and operator room.     Pure Water Technology has been awarded by Tourism Development & Investment Company (TDIC) for the Operation and Maintenance of Sewage Treatment Plants (STP's) at Sir Baniyas Island (SBY), Abu Dhabi.     Pure Water Technology has been awarded by Abu Dhabi Sewarage Services Company (ADSSC) a contract on Odour Control System for Abu Dhabi Island by Chemical Dosing.This includes the supply, erection and commissioning of H2S meters, Dissolved Sulfides Testing and  chemical dosing systems.     Pure Water Technology has been awarded by GHQ to design and construct Sea Water Desalition Plant capacity of 3,500 m3/day including drilling of borewell, raw water network and submersible pumps.     Pure Water Technology completed the turn key project awarded by GHQ for pumping and filling station at Sweihan.     Pure Water Technology completed the EPC contract for reverse osmosis plant with a capacity of 2000 m3 at Al Saad Abu Dhabi.     Pure Water Technology completed the supply and installation of Reverse Osmosis Plant at Buteena Island Abu Dhabi for Drinking purpose.     Pure Water Technology has been awarded by  Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-11014 for the Design and Construction of Sila Waste Water Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing.     Pure Water Technology has been awarded Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-12097, Upgrade Infrastructure at Al Quoa, Wadi Al Flaie and Al Hayer Areas for the design and construction of Waste Water Treatment Plant. Brief Description of Main Works: Design and Build works to upgrade/refurbish Al Hayer WWTP and other associated components from 1,250 m3/day to 3,900 m3/day. Design and Build works to upgrade/refurbish Al Quoa WWTP and other associated components from 1,680 m3/day to 4,480 m3/day with a provision to expand further in future to 5,600 m3/day. Design and Build Works to upgrade/refurbish Wadi Al Flaie WWTP and other associated components from 840 m3/day to 2,090 m3/day with a provision to expand further in future to 2,500 m3/day.     Pure Water Technology has been awarded by Abu Dhabi Sewerage Services Company (ADSSC) Contract No. O-11542, Miscellaneous Works Related to Development Project in Abu Dhabi Emirates, Phase 4-Network and WWTP Capacity Enhancement in Madinat Zayed.     A group picture with Abu Dhabi Sewerage Services Company (ADSSC) Board Chairman, H.E. Abdulla Ali Musleh Al Ahbabi along with Dia Ajjouri Managing Director of Purewater Technology LLC at Sila Waste Water Plant project during the handing over. Along with them are from left to right, Mr. Ahmed Ajjouri Projects & Operation Manager, Mr. Fadi Mansour Design & Technical Manager, Mr. Mohammed Elgouda Parsons Manager for ADSSC Projects, Mr. Sameh Salem PWT Electrical Engineer and Mr. Habibuddin Parsons Assistant Resident Engineer.    

Welcome To Pure Water Technology

Pure Water Technology specializes in engineering, manufacturing and construction of water and wastewater treatment plants for commercial, industrial and municipal with backed up in-house engineering to provide solutions to your entire temporary, emergency and long term total water and wastewater management resource recovery needs.

Our services and activities are the result of the latest state-of-the-art technology and the selection of the most appropriate economic alternatives in the water and wastewater industry such as reverse osmosis plant, industrial and municipal wastewater treatment plant, pumping and lifting stations, water tanks and piping networks and water filtration and softening system, our quality management and organization system has been certified by IIC according to ISO 9001:2008 and ISO 14001:2004 for environmental management system. Equipment is manufactured under conformity with related EU mechanical and electrical directives and CE mark.

We also have our own laboratory for water and wastewater testing and analysis and we offer back-up support and troubleshooting services for our clients.Check out our Activities & Services page for your requirements.

Newsletter Sign Up

We’ll do our best to deliver valuable updates and lots of great resources without invading your mailbox.