EPC works for the Upgradation of Madinat Zayed wastewater treatment plant from the existing capacity of 15,000m3/day to 30,000m3/day. Including construction of inlet lifting station, balancing tank, aeration tanks, clarifiers, filtration, chlorination, sludge digesters, sludge drying beds, TSE storage reservoir capacity of 30,000 m3, the Final Effluent Pump Station (FEPS), Substation, Electrical & Control Building, Air Blower Building, including internal roads, and all ancillary works and Testing and Commissioning.
The Scope of works includes 17,000 m of TSE Transmission line from the Effluent Pump Station to R3 pumping station, and distribution lines from R3 PS to two (2) TSE storage reservoir at Madinat Zayed farms locations.